KUALA LUMPUR: Malaysia needed to ensure it has adequate flexibility to deliver the best value for the country in the construction and operation of the proposed high speed rail (HSR) from Kuala Lumpur to Singapore, and for that reason, any additional layer that adds cost and unnecessary rigidity of the project has to go under the present climate. Read full story
from mdnursyazwi https://ift.tt/3s7lxZY
via http://www.rssmix.com/
from Tumblr https://dearluce.tumblr.com/post/639819801718620160
No comments:
Post a Comment